Define the ton
A US short ton is 2,000 lb; a metric tonne is 1,000 kg. Never label either simply as ton in a comparison.
REQUEST A QUOTE
Send the details you already know. Our team can review the remaining technical points with you.
Technical guide
A stainless steel price per ton is meaningful only when the currency, ton type, grade, product, dimensions, quantity, quote date, surcharge basis and delivery terms are stated.
Decision summary
Published metal references do not equal the delivered stainless product price. Normalize units and commercial scope before comparing suppliers.
A US short ton is 2,000 lb; a metric tonne is 1,000 kg. Never label either simply as ton in a comparison.
Sheet, coil, plate, bar, pipe and fabricated parts have different conversion, yield and processing costs.
Nickel, chromium, molybdenum and other alloy content affect surcharge; condition and finish affect conversion.
Metal references and surcharges change over time, so comparisons need the same pricing period and validity.
Freight, insurance, duty, tax, destination, packaging and Incoterm can materially change landed cost.
Testing, certificates, PMI, NDT, third-party inspection, cutting and rush production should be visible line items.
Reference table
A transparent quotation separates material-market inputs from mill conversion, processing and logistics.
| Cost component | What it represents | What to state in the RFQ | Comparison risk |
|---|---|---|---|
| Base price | Underlying commercial product basis | Product form, grade family, quantity and pricing period | May differ by market and supplier |
| Alloy surcharge | Periodic adjustment for alloying inputs | Grade, surcharge month and supplier basis | Published formulas are supplier-specific |
| Size and finish extras | Gauge, width, tolerance, surface and condition | Exact dimensions, finish, edge and condition | Nominal descriptions hide conversion scope |
| Processing | Cutting, polishing, forming, machining or fabrication | Drawings, tolerances, nesting and scrap ownership | Yield loss may be included differently |
| Testing and documents | MTC, PMI, NDT, corrosion tests or inspection | Required standard, sampling and certificate type | Optional scope can distort unit price |
| Packaging and logistics | Protection, freight, insurance, duty and tax | Destination, Incoterm, mode and packaging | Mill price is not landed cost |
This page does not publish a live market price. Use a dated supplier quotation for purchasing and identify whether the price is per short ton or per metric tonne.
Working method
The goal is a common commercial basis so unit-price differences reflect real scope rather than missing requirements.
State grade, standard, form, condition, dimensions, tolerance, finish, quantity and allowed substitutes.
Specify currency per kg, per lb, per metric tonne or per short ton and whether theoretical or actual weight governs.
Request separate surcharge, size extras, processing, testing, packaging and expedite charges.
State destination, Incoterm version, taxes or duties, lead time, validity and payment terms.
Limits and escalation
Nickel or other exchange prices are only inputs to supplier formulas and do not include conversion or delivery.
Supplier, region, product and month can use different published mechanisms.
Theoretical and actual shipped weight can differ because of tolerances, cutting yield and packaging.
Exchange rates, validity periods and payment terms can change the true comparison.
Interactive planning aid
Enter a price in USD per pound. The calculator converts it to USD per US short ton and USD per metric tonne without adding surcharges, processing or freight.
Frequently asked questions
Method, sources and review
Official exchange reference prices used by market participants.
Official explanation and access point for LME reference-price data.
Producer explanation and published surcharge resources; total stainless price includes base, extras and alloy surcharge.
Official US measurement reference supporting pound and kilogram conversion.
The calculator performs unit conversion only and is not a market-price feed. Purchasing decisions should use a dated supplier quote with currency, unit, surcharge, extras, delivery scope and validity stated.
Commercial basis context
A per-ton reference needs the same grade, form, dimensions, finish, quantity, inspection, packaging and delivery terms before it can support a sourcing decision.
Visual process context
Reserve one image for the product form and another for packing, loading or the delivery basis used in the comparison.
Engineering and sourcing support
Send grade, standard, form, dimensions, finish, quantity, tests, currency, ton type, Incoterm and destination.