Identify the supplied item
State the product form, grade, dimensions, quantity, delivery condition and any processing that affects the inspection scope.
REQUEST A QUOTE
Send the details you already know. Our team can review the remaining technical points with you.
Quality and inspection
Inspection, certificates and traceability work best when the product scope and acceptance basis are defined before material is ordered. Use this page to structure the questions that belong in the RFQ.
Before inspection
A material certificate or inspection result only has meaning when it is tied to the actual supply and the agreed acceptance requirement.
State the product form, grade, dimensions, quantity, delivery condition and any processing that affects the inspection scope.
Set the applicable standard, tolerances, surface condition, test method and sampling basis required for acceptance.
Specify the certificate, test report, marking and traceability information needed with the shipment.
Inspection route
Describe the product, specification and inspection points that are already known.
Review availability, capability, testing and documentary needs for the specific supply.
Keep the agreed result linked to the supplied lot, marking and required certificate.
Documentation and traceability
The needed evidence depends on the product, the application and the contract. Ask for what must be traceable rather than treating every document as interchangeable.
Open traceability guideIdentify the certificate format and the properties or tests it needs to report for the order.
Connect the material marking, heat or lot reference and supplied documents where the project requires it.
Define whether additional inspection, witness points, third-party review or special reporting is required.
Useful limits
Do not replace an unknown standard, test method or acceptance limit with a generic statement. Flag it in the enquiry for confirmation.
A technical page can help frame a request, but the agreed product specification controls final acceptance.
A result needs the applicable method, sample, condition and scope before it can support an acceptance decision.
Availability, lead time, commercial terms and actual documents are confirmed for the specific supply request.
Quality resources
Prepare the product, test and document questions that should be clear before review.
Open checklist RFQTurn known material and quality requirements into a more useful request.
Open RFQ checklist DATAReview material references while keeping final acceptance tied to the applicable specification.
Open data library